Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

High-Voltage Direct-Current Transmission System to Serve Industrial Region in India

For the private investor Adani Power Limited (APL) Siemens Energy is to install a bipolar 500-kV high-voltage direct-current (HVDC) transmission system with a capacity of 2,500 MW in India. Starting in February 2011, the HVDC system is scheduled to provide low-loss transmission of electrical energy over a distance of approximately 960 km from a coal-fired power plant near the port city of Mundra on India’s west coast to the industrial regions of the state of Haryana in the vicinity of New Delhi.

Adani Power will not only operate the HVDC system; the private investor is also owner of the coal-fired power plant near Mundra. Adani is also India’s major importer of coal and operates the world’s largest harbor terminal for imported coal. At the same time the Ahmedabad-based company is India’s largest private energy trader. Adani’s coal-fired power plant in Mundra has a total capacity of 4,620 MW and is in the future to supply urgently required electrical energy to the Haryana industrial region near New Delhi, which is located approximately one thousand kilometers away. Low-loss transmission over that distance is only possible with the planned HVDC system.

Siemens will assume overall responsibility for the project, including design of the entire HVDC system, and will supply core components such as the converter valves, converter transformers, smoothing reactors, protection and I&C equipment, and the AC and DC filters. Siemens will also handle shipping operations, civil engineering, installation and commissioning. “This project marks a further milestone in the expansion of our HVDC competence in India“, said Dr. Udo Niehage, CEO of the Power Transmission Division of Siemens Energy.

This is the third HVDC system to be installed by Siemens in India. The converter station at the start of the transmission line will be erected right at the power plant’s substation. Siemens will erect the second converter station at the end of the HVDC link in the vicinity of the “Bhiwadi” converter station. This station is part of the “Ballia-Bhiwadi“ HVDC system, which is still under construction. This system is the second HVDC transmission line built by Siemens in India. It is scheduled to come on line in November of this year.

The first HVDC transmission line was the long-distance east-south link, at that time the world’s second longest HVDC link. Since 2003, the Siemens system has been providing low-loss transmission of electrical energy from the Talcher power plant complex in the state of Orissa in eastern India over a distance of 1,450 km to the south to the industrial region around Bengaluru.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues