Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.


  

InfraSource Completes New 345 kV/115 kV Killingly Substation for Connecticut Light & Power

InfraSource Services, Inc. (NYSE:IFS), one of the largest specialty contractors servicing utility transmission and distribution infrastructure in the United States, announced that its M. J. Electric (MJE) business unit located in Shoemakersville, PA, recently completed work on a new 600 MW, 345-kV/115-kV “greenfield” substation for Connecticut Light & Power (CL&P) in Killingly, CT.

The Killingly construction project involved installation of two 345-kV EHV circuit breakers, eight 115-kV circuit breakers, and all associated relaying and communications. Civil construction began in November 2005; electrical work commenced in May 2006. The substation was energized December 8, 2006 and load added on December 11, 2006. Testing was completed February 25, 2007.

MJE crews tapped into one 345-kV and two existing 115-kV transmission lines; upgraded two 115-kV terminals at CL&P Tracy and Tunnel substations; and, upgraded communications and relaying at CL&P’s Tracy, Tunnel, Lake Road Generating and Fry Brook substations.

MJE is also relocating an existing 345-kV breaker at the Card Street substation and installing a new 345-kV breaker and associated relaying in series with the relocated breaker.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.

T&D TV

Most Read


Find Other Popular Items

Community

T&D World TV


Thomas & Betts - Collaboration. Commitment. Customer-Focus: Our promise to you. With over 50 years of pioneering design expertise and a partnership approach to every project, Thomas & Betts has a well-earned reputation as an innovator and a problem solver. Watch Now »


Siemens - Covering the entire spectrum of energy automation. Watch Now »

Podcasts

Building a Smarter Grid: Managing Assets to Improve Utility Decision Making
Sponsored by ABB
Join Greg Scheu, President and Head of Power Products for ABB, and Rick Bush as they discuss how utilities can extract more value from existing grid infrastructure by managing the overall assets of the T&D operation. Listen Now »

More from Building A Smarter Grid


Electromagnetic Pulse Discussion with Eric Hsieh
NEMA Government Relations Manager Eric Hsieh discusses an EMP and its possible effects on the electric grid.

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues