Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Juan de Fuca Cable - Transport Canada Navigable Waters Permit Issued

Sea Breeze Power Corp. reports that Transport Canada has granted a “Navigable Waters Permit” to facilitate construction of the Juan de Fuca Cable Project, a 550-MW High Voltage Direct Current Light submarine transmission line to connect Vancouver Island and Washington State’s Olympic Peninsula.

Paul B. Manson, President & CEO, said: “The granting of this permit is indicative of the steady progress of this project and supports our expectation that the project may soon be in construction.

“Juan de Fuca Cable will complement the existing grid and will add reliability, capacity and flexibility to transmission operations in the region. The project will strengthen British Columbia’s electrical reliability and will particularly ensure that Vancouver Island’s electricity needs will continue to be met,” Manson added.

The Transport Canada permit, issued from the Pacific Region Marine Branch, contains a number of conditions that will be met by Sea Breeze. In part, these conditions are meant to ensure that the project does not interfere with navigation or anchorages and that the integrity of the foreshore and marine environment is protected.

This permit follows National Energy Board project approval in 2006 and issuance of a US Presidential Permit and a US Army Corps of Engineers Permit in 2008.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues