Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Information Meeting in Kloosterveen on High-Voltage Connection Work

TenneT is upgrading the transmission capacity of the existing 220-kV electricity connection between Zwolle and Groningen in the north of the Netherlands. This expansion is necessary because the transmission capacity of the present grid infrastructure is insufficient to handle the expected increase in production in the near future. As this means that work will take place near Kloosterveen, an information meeting is being organised in this district.

The work consists of reinforcing the high‑voltage pylons and foundations and replacing the conductors (wires) and insulators in the pylons. It is expected that work in Assen will begin at the end of March. Upgrading the connection has no effect on the magnetic field zone in the region due to the fact that the lines are suspended in a different way and closer to the pylon. TenneT is aiming to limit nuisance to residents as much as possible during the work.



The information meeting will take place on 22 March from 4pm until 8pm in the:

Koffiebranderij Konvent, Hoofdvaartsweg 124 in Assen.



This information meeting will involve a number of information stands rather than a central presentation. Specialised members of staff will be at these stands to provide information on how the high-voltage connection functions, the work to be carried out and why the connection needs to be upgraded.



Expansion
The capacity upgrade will allow small-scale wind energy and combined heat and power (CHP) initiatives, as well as new large-scale production capacity at Eemshaven, to be connected to the high‑voltage grid over the coming years. The upgrade of the Zwolle – Groningen connection is scheduled for completion in the first half of 2011.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues