Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

LIPA/Neptune Activate New Cable Bringing Lower-Cost Energy Directly to Long Island from New Jersey for the First Time

The Long Island Power Authority (LIPA) and Neptune Regional Transmission System, LLC today announced that the Neptune electric transmission cable between New Jersey and Long Island has completed testing and has been in trial operations under the control of the Long Island Power Authority (LIPA) providing low cost energy to Long Island just in time for the peak summer season when demand for electricity is highest.
The over $600 million, 65-mile long Neptune Regional Transmission System is an undersea and underground High Voltage Direct Current (HVDC) system that includes a cable that runs from Sayreville, New Jersey to New Cassel in the Town of North Hempstead in Nassau County. It carries 660 MW of energy, which is enough to meet the electricity demands of about 600,000 average-sized homes.

“Long Island enters a new era with the Neptune cable,” said LIPA Chairman Kevin Law. “The Neptune cable provides LIPA with the opportunity to acquire lower-cost energy to meet customer needs while providing more flexibility in selecting the markets from which we acquire that energy. It is a significant win-win for Long Island.”

“I am extremely pleased that the Neptune cable is now providing much needed energy for Long Island at the start of the summer season when demand for electricity is highest,” said LIPA CEO and President Richard M. Kessel. “When we first proposed the idea of an Atlantic cable in early 2003, the critics doubted it could be done. Through the hard work and dedication of a great many people at LIPA, Neptune and KeySpan personnel, and the regulatory entities involved with the review and approval of this project, Long Island will be well served by the Neptune cable for decades to come.”

“The Neptune project is an example of how this type of technology can bring much-needed electric power and transmission infrastructure to densely populated areas in a cost-effective and environmentally friendly way,” said Edward M. Stern, Neptune’s President and Chief Executive Officer. “Many American cities that face growing demand for energy would be well served by implementing projects such as Neptune – and more renewable energy projects would be built to serve such demand,” Stern added.

“In completing the project ahead of schedule and in time for the summer peak load period, we want to acknowledge the extraordinary teamwork and cooperation from LIPA, our principal contractors Siemens and Prysmian as well as from KeySpan, PJM, NYISO, and various Federal, New Jersey and New York State agencies such as the New York Office of Parks and Historic Preservation, Department of Transportation, Department of Environmental Conservation, and Department of Public Services, and from the Towns of North Hempstead and Hempstead, and the Borough of Sayreville, New Jersey.”

In 2004, Neptune was selected as the off-Island component of a diverse portfolio of resources developed under a comprehensive request for proposals (RFP) process in accordance with the procurement requirements of the State of New York. The on-Island component is the Caithness Long Island Energy Center project, a 350 MW combined cycle generating facility currently under construction in Yaphank, Suffolk County, which is expected to be in service by the summer of 2009.

Under LIPA’s 20 year agreement with Neptune, up to 660 MW of electricity will be delivered to a station in Sayreville, New Jersey, where it will be converted from alternating current (AC) to direct current (DC) for efficient transmission to Long Island via the undersea and underground HVDC cable. The cable route travels east 51 miles from the Jersey shore to a point south of Jones Beach on Long Island, then goes north to another station in New Cassel where the electricity will be converted back to AC for use on LIPA’s system. The power is delivered to LIPA’s Newbridge Road substation in Levittown.

To get the power out to LIPA’s grid, the Newbridge Road substation was substantially upgraded, and new underground transmission lines were installed that connect it to the East Garden City substation to the west, and the Ruland Road substation to the east in Melville. Both the East Garden City and Ruland Road substations underwent major upgrades to receive the power and make it deliverable to LIPA’s customers.

In June 2004, the 330 MW Cross-Sound Cable went into regular commercial service, linking Shoreham, Long Island to New Haven Connecticut. Together, the Neptune and Cross Sound cable systems provide LIPA with direct access to two independent power pools in the PJM and New England markets. They add a combined 990 MW of off-Island resources to LIPA’s supply.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues