Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Manitoba Hydro Plans HVDC Transmission Line to Improve Reliability

Manitoba Hydro announced that the corporation will move forward with plans to build a new high voltage direct current (HVDC) transmission line, known as BiPole III, on the west side of the Province.

"BiPole III is an extremely important project that will improve the reliability of the electrical system for Manitobans," stated Bob Brennan, Manitoba Hydro President and CEO. "More than 75 percent of Manitoba Hydro's electricity production is supplied through the two existing HVDC lines that run from the Gillam area through the Interlake to the receiving station northwest of Winnipeg. The third HVDC line, placed at some distance away from the existing lines, would act as a back-up to the current system as well as being able to carry power from new generation, including Conawapa, to the south and to export markets."

The proposed line will originate near Gillam, run to the west of Lake Winnipegosis and terminate at the Riel Converter Station near Winnipeg. An extensive transmission and distribution network already exists on the west side of the province, including transmission running from the Nelson River area to southern Manitoba.

The precise route location will be determined after a multi-year environmental assessment, design and public consultation process that will be initiated later this year. The transmission project will need to receive approvals from the appropriate federal and provincial agencies.

Once the project design and route have been finalized, Manitoba Hydro will move forward to secure the environmental approvals necessary for construction. Targeted in-service date is 2017.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues