Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Early Finish for 400-kV Overhead Line Work Sees Road Closure Lifted

A temporary road closure was lifted Monday, 17 October after National Grid completed overhead line refurbishment work in the Wiggenhall St. Germans area more than two weeks ahead of schedule. A section of Lynn Road from Thiefgate Lane to Mill Road was due to be closed until 3 November but engineers finished rewiring a section of the 400-kV high-voltage power line, which runs close to the road a fortnight earlier than expected.

National Grid project manager Simon Chandler said: “We would like to thank everyone for bearing with us. We are conscious that Lynn Road is the main route into King's Lynn from several outlying villages and we have been focusing on completing this section as quickly as possible.

“We will now be continuing the refurbishment on the remainder of the overhead line which is due to be completed in November. This is an essential project that will help to ensure that our electricity supply continues to serve us safely, reliably and efficiently for decades to come, securing our energy supply for future generations.”

National Grid started work in April on a £50 million project to rewire the 52-mi (84km) high-voltage line which runs between Norwich and Walpole. Engineers are renewing the conductors (wires) and fittings and carrying out strengthening work on some of the 224 pylons.

The 400-kV power line was built in the early 1960s and needs refurbishing. The work will enable National Grid to increase the capacity of the line and the network in East Anglia to secure future energy supplies. The project is being carried out by National Grid, leading an electricity alliance with Balfour Beatty.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues