Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.


  

National Grid’s Woodhead Tunnel Cable Replacement Project Underway

High-voltage cables installed in the disused Victorian railway tunnels in the 1960s, to bring new electricity supplies to the Manchester, UK area from power stations east of the Pennines area nearing the end of their operational life and are being replaced by National Grid (UK). The Woodland Tunnels comprise three adjacent ex-railway tunnels, each approximately 4,840 m (about three miles) long.

The tunnels formerly carried a Trans-Pennine rail link (commonly known as the Woodhead Route) from Manchester to Sheffield. The western entrances are at Woodhead in Derbyshire and the eastern entrances are at Dunford Bridge, near Penistone, South Yorkshire.

The decision to put cables in the tunnels rather than building new overhead power lines across the moors was made after representations to a public inquiry by the Peak Park Planning Board. The tunnels were bought by National Grid's predecessor organization, the Central Electricity Generating Board (CEGB), and are now owned by National Grid.

The Woodhead Tunnel cables form part of the 400-kV transmission system, which runs between National Grid's substations at Stalybridge, east of Manchester and Thorpe Marsh, near Doncaster.

At the time of their completion in 1845, the two Victorian tunnels were among the world's longest railway tunnels. British Rail added a third tunnel in 1953. The Victorian tunnels were acquired by the CEGB in the 1960s to carry the trans-Pennine 400-kV electricity link below ground, rather than over the moors of the Peak District National Park.

It is not possible to install new electricity cables alongside the existing cables in the Victorian tunnels for two reasons:

  • Firstly, to ensure continued safe and secure electricity supplies for Greater Manchester, the existing cables need to remain in service while new cables are installed. Because of the confined space, there is not enough room to carry out major engineering works to install new cables in the tunnels alongside the existing "live" 400-kV cables.
  • Secondly, despite a great deal of maintenance work over the years, the condition of the Victorian tunnels has continued to deteriorate and they would require considerable civil engineering works at substantial additional cost to be made safe for long-term use for any purpose.

Therefore the replacement cable circuits will be installed in the third, more modern, Woodhead Tunnel. This tunnel was closed in 1982 and was bought by National Grid in the early 1990s with this purpose in mind. This project forms part of National Grid’s ongoing national investment program and represents a significant investment in the region’s power network.

The new cables are being installed in the 1953 tunnel, via the entrance at Dunford Bridge, by the Electricity Alliance - East on behalf of National Grid.

Work began in February 2008 and will take approximately two years to complete. As the vast majority of the work takes place within the tunnel itself, the impact on the environment, the local community and visitors to the area is much less than that usually associated with major engineering works. However, some work is also required at the Woodhead tunnel entrance, the terminal pylons and the sealing end compounds at both ends of the tunnel.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.

T&D TV

Most Read


Find Other Popular Items

Community

T&D World TV


Thomas & Betts - Collaboration. Commitment. Customer-Focus: Our promise to you. With over 50 years of pioneering design expertise and a partnership approach to every project, Thomas & Betts has a well-earned reputation as an innovator and a problem solver. Watch Now »


Siemens - Covering the entire spectrum of energy automation. Watch Now »

Podcasts

Building a Smarter Grid: Managing Assets to Improve Utility Decision Making
Sponsored by ABB
Join Greg Scheu, President and Head of Power Products for ABB, and Rick Bush as they discuss how utilities can extract more value from existing grid infrastructure by managing the overall assets of the T&D operation. Listen Now »

More from Building A Smarter Grid


Electromagnetic Pulse Discussion with Eric Hsieh
NEMA Government Relations Manager Eric Hsieh discusses an EMP and its possible effects on the electric grid.

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues