Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

NorNed HVDC Cable Project Nears Completion

The completion of the NorNed cable laying process between Norway and the Netherlands and the building of the new converter stations in Norway and the Netherlands are expected mid October 2007. After this completion, the NorNed high voltage direct current (HVDC) link will be tested to ensure a reliable infrastructure to the market, currently foreseen to become available in the second half of November 2007.

The NorNed-cable is an interconnection between The Netherlands and Norway. The project is a joint effort by the two national Transmission System Operators, TenneT and Statnett, as equal partners. NorNed will be an open interconnection which will be utilized via so called market coupling of the Dutch and Nordic markets This will be handled by the power exchanges APX and NordPool.

The test program comprises a low power (LP) test sequence to validate the base functionality of the NorNed HVDC link and a high power (HP) test sequence to ensure a reliable infrastructure able to take a stable and controlled 700 MW transmission. The LP tests typically take in between 30 MW and 100 MW in both directions. These LP tests will last at minimum 125 hours of actual power transmission. Taking into account the inevitable start up failures, experience indicates a potential for more hours of actual LP testing. The HP tests will be at cable load up to full capacity of 700 MW. An expected scenario indicates HP testing at 700 MW for approximately 50-60 hours, where both directions are tested.

Ensuring a reliable NorNed HVDC link might require more hours of HP testing.
Where the LP tests are characterized by high failure rates and therefore planning uncertainty, the required test power will be secured via the balancing markets. For the HP tests the program will be placed on the day-ahead markets. To minimize cost for test power the southbound HP tests will be executed in daytime where the northbound HP tests will be executed at night, thus taking into account price levels in Norway and the Netherlands.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues