Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Provisional Decision on New High‑Voltage Connection

The Minister of Economic Affairs and the Minister of Housing, Spatial Planning and the Environment, The Netherlands, have made a provisional decision on the new high‑voltage link between Zoetermeer/Bleiswijk and Beverwijk, the so‑called ‘North Ring’ of the Randstad 380-kV project. The decision is another step towards realization of this major new electricity connection. In their decision, the two ministers indicate that recent developments concerning the cable route are to be retained. In order to inform local residents as thoroughly as possible, four additional information evenings will be organized for local residents and other interested parties in late November and early December.

In December 2008 the Minister of Economic Affairs and the Minister of Housing, Spatial Planning and the Environment informed the Lower House of Parliament about the proposed cable route. Since then, the route has undergone further optimization. The ministers are currently preparing a so‑called National Integration Plan, a type of zoning plan at the national government level. Pending completion of this plan, a provisional decision has now been taken. This decision defines the area for which the National Integration Plan is to be prepared.

In the larger part of the area concerned, a 200‑m wide zone is to be reserved for the electricity connection. Local authorities that receive an application for a construction or installation permit within this zone must put the application process on hold. If it turns out that the construction plan is in conformity with the National Integration Plan currently being prepared, the application can be taken into consideration. Any application that does not conform to the National Integration Plan must be put on hold until the Plan has entered into force.


The Ministers consider it important to continue informing interested parties as thoroughly as possible. That is why four additional information evenings will be organized in the near future. Staff from the government authorities concerned and from TenneT will be present to answer any questions on the various issues, the procedures that will be followed, and the proposed route of the cable. As no official decision has been made as of yet, no comments can be submitted under the public consultation procedure. An official draft decision (i.e. the National Integration Plan) is expected to be announced in the course of 2010, at which time any interested parties can submit comments.


The new Randstad 380-kV connection is being constructed to ensure sufficient capacity for electricity transmissions in the future. This will help safeguard the security and continuity of the Dutch energy supply. The connection, which is to be constructed by electricity transmission operator TenneT, comprises two sections: one between Beverwijk and Zoetermeer (North Ring), and one between Zoetermeer (Bleiswijk) and Wateringen (South Ring).

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues