Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

New Zealand Kaitimako Switching Station Completed Successfully

Transpower has successfully commissioned its Kaitimako switching station in the Bay of Plenty, New Zealand, to provide more transmission capacity into the Bay of Plenty area. The switching station has been completed on time and on budget.

Tauranga is one of the fastest developing areas of the country, with the demand for electricity in the Bay of Plenty area rising by 50 percent in the past 10 years, causing constraints on the National Grid.

The new Kaitimako substation will allow more power to flow through existing transmission assets which will help to meet the electricity needs of Bay of Plenty homes and businesses.

Transpower’s General Manager National Grid David Laurie said that the project delivery had been highly successful. “My congratulations go to all of the Transpower staff, contractors and consultants who helped to get this project to completion.  Thank you also to the surrounding residents who were supportive of the project and the local iwi who worked with us. The new switching station will be highly beneficial for the Bay of Plenty area going into the future.”

“When planning this project, we recognized that the demand forecasts for the region were still relatively high therefore ensured that should it be needed, further equipment can be installed at the 220-kV switchyard relatively easily to meet any future growth.”

The works involved building two platforms – one 110-kV and one 220-kV. The 110-kV has been fitted with equipment, however the 220-kV will remain bare until new equipment is needed – when demand exceeds the capability of the 110-kV switchyard.

Also installed was a new transmission tower to connect the switchyards to the existing high voltage lines. Extensive planting has also been undertaken.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues