Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

NorthWestern Energy Announces Plans to Upgrade Transmission Line Serving Big Sky, Montana

The rapidly growing demand for electricity in and around Big Sky, Montana along with future planned development has prompted NorthWestern Energy to begin the process to upgrade one of the existing transmission lines serving the area. The company is seeking the necessary permits to rebuild the existing 69-kV transmission line between the Jack Rabbit Substation west of Bozeman and a new substation near Meadow Village in Big Sky. The approximately 35-mile 161-kV transmission line would eventually replace the existing line along the existing corridor that roughly follows US Highway 191. 

“Gallatin County in general, and the Big Sky area in particular, has experienced significant growth in recent years and with additional planned development in both the residential market and resort industry, we only expect that growth to continue,” said Dave Gates, Vice President – Wholesale Operations.  “The new transmission line and associated substation equipment is necessary to ensure that the area has adequate capacity for future growth while improving reliability for existing customers, especially during periods of high electric demand,” Gates added.

The new line will consist of a combination of single-pole, wooden structures placed approximately 300 ft apart. In some areas two-pole wooden "H-frame" structures may be used to allow further spacing between structures.  The standard right-of-way width for a single pole 161-kV transmission line is 50 ft. The standard right-of-way width for a two-pole “H-frame” line is 80 ft. The height of the new structures will vary from 60 ft above ground to 90 ft, depending on terrain and structure type.

While the engineering design and permitting requirements will determine the actual cost and construction duration, the construction on the estimated $20-30 million project would begin sometime after the permitting process is completed in mid-2009 and may take up to three years to complete.

The company plans to build the new line under a statutory exclusion from the Montana Major Facility Siting Act. Under Section 75-20-104(8)(a)(ii), MCA, the line would be excluded from Siting Act coverage if NWE obtains right-of-way agreements or options for a right-of-way from more than 75 percent of the landowners who collectively own more than 75 percent of the property along which the new line is to be located.  If NorthWestern is unable to obtain the statutory exclusion, the Siting Act's full public and agency review provisions will apply to the new line. The Montana Department of Environmental Quality (DEQ), which administers the Siting Act, will then determine the line location.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues