Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

New Cable Between Norway and Denmark Planned

Statnett in Norway and Energinett.dk in Denmark are now applying for permission from the authorities to expand the transmission capacity for electricity between the countries by applying for a concession for facilities for a new cable from Southern Norway to Jylland in Denmark. The cable will have a capacity of 600 MW and will cost NOK 3 billion.

"There is a need for more cable connections between Norway and Denmark, both to ensure energy supply in periods with little precipitation as well as it being a climate-friendly initiative. A new cable to Denmark can be in place by around 2014," says Odd Håkon Hoelsæter, CEO of Statnett.

Statnett and Energinett.dk presently own and operate three DC power cables between the countries, called the Skagerrak cables. The companies now aim to expand their collaboration by applying to the authorities for permission to build a fourth cable connection between Norway and Denmark, Skagerrak 4. The companies emphasize that a decision regarding investments will not be taken before the authorities have granted the concession.

Energinet.dk is also working together with E.On Netz to increase the transmission capacity between Jylland and Germany. A new cable connection between Norway and Denmark will thereby also lead to better capacity for exchange of power with Northern Germany.

Skagerrak 4 brings about ground-breaking solutions. Part of the capacity (100 MW) will be reserved for the sale of regulation services from Norwegian hydroelectric power plants to Denmark. It is the first time that hydroelectric powers' special ability for speedy production is being utilized commercially through this type of service. This will also be highly useful as a "back-up" for Danish wind power.

The investment will increase the transmission capacity between Norway and Denmark by approximately 60 per cent. Skagerrak 4 will comprise one new sea cable approximately 130 km in length, and facilities through to each country's main grid. On the Norwegian side new power lines, approximately 10 km in length in parallel with the lines for the three existing Skagerrak cables, are planned. There is no need for additional power lines in Norway. On the Danish side Skagerrak 4 will be connected through to the main grid in Tjele, Jylland. The total cost of the project is approximately NOK 3 billion (EUR 370 million). The investment in the sea cable will be shared equally (50 per cent each) between the companies, while the country-based investments will be covered by the individual company.

The existing Skagerrak cable has a total transmission capacity of approximately 1000 MW. Skagerrak 1 and 2 were put into operation during the period 1976 - 1977, and Skagerrak 3 in 1993. The existing connection has been important both in contributing to a more effective Nordic energy market and in securing Norway a better energy supply in those years where the production of hydroelectric power is low. For Denmark the Skagerrak cable has been important for the market activity in West Denmark. The Skagerrak cable has in this way given great utility value in both dry and wet years, as well as higher socio-economic benefits over many years.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues