Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

NPPD Selects Final Transmission Line Route

With a 30-day public comment period complete, Nebraska Public Power District has determined the final route for its 115-kV Broken Bow Transmission Line Project. When completed, the new power line will support the delivery of electricity from the planned Broken Bow wind farm, to be constructed northeast of the community in 2012, to NPPD’s existing substation south of Broken Bow.

The 115-kV transmission line will follow a north-south route from the wind farm collector substation in northeastern Custer County, cross Highway 70, then turn west across Highway 2 to the existing Broken Bow substation, located on the southern border of the city.

The right-of-entry process is now underway, allowing key activities to be conducted on private property including surveying, preliminary field engineering, and land appraisal. Easement acquisition is expected to start later this year followed by construction early next year, with the line going into operation in the fall of 2012.

NPPD Project Manager Jedd Fischer said that every effort has gone into reviewing all comments and concerns from landowners, in order to be able to come up with a final line route. “There may be some minor tweaking of the route as we move along as additional information is gathered from the right-of-entry process and surveying activities,” he explained.

NPPD right-of-way agents have been contacting landowners affected by the line to acquire right-of-entry agreements where preliminary work is required. The agents are making appointments with the landowners to explain the right-of-entry process and subsequent activities. Once a right-of-entry agreement has been signed by the landowner, activities will begin.

Preliminary field engineering activities include identifying sites where structures may be located and conducting environmental studies. Information gathered from land surveys and preliminary field engineering will be used to develop the final right-of-way easement. Preliminary field engineering will be managed by POWER Engineers.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues