Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

PJM Board Authorizes $2.1 Billion in Transmission Additions and Upgrades

The PJM Interconnection Board approved $2.1 billion in electric transmission system additions and upgrades to maintain the reliability of the power supply system serving 51 million people in 13 states and the District of Columbia. The additions include a new 500-kV transmission line through the Delmarva Peninsula.

The PJM Board has authorized a cumulative $9.3 billion in transmission improvements since 2000 when the first Regional Transmission Expansion Plan was approved.

"Our regional planning process continues to prove itself," said Karl V. Pfirrmann, PJM's interim president and chief executive officer. "Our members are making the necessary investments to ensure reliability of the electric system that people depend upon."

The proposed new 500-kV transmission line would run approximately 230 miles from the Possum Point Station at Dumfries, Va., through the Delmarva Peninsula and end at the Salem Station in Lower Alloways Creek Township, N.J. It is estimated to cost $1.05 billion.

An in-service date will be established pending additional analysis. The line is being recommended now to provide time for permitting and construction. Pepco Holdings, Inc., the utility building the line, will determine the route it will follow subject to government and regulatory approval. PJM does not set the routes.

Also known as the MAPP project, the new line will relieve expected overloads on the existing transmission system. It also improves the ability to deliver electricity to customers on the Delmarva Peninsula. That area has both limited local generation and limited transmission, which comes only from the north. The new line will provide a transmission path into the southern end of the peninsula. It also addresses power supply concerns raised by the pending retirements of two power plants near Washington, D.C. The two generating stations, Benning Road and Buzzard Point, total 800 MW of capacity.

The updates to the regional transmission plan include several other significant projects.

A new 345-kV transmission line will be built between the Carson and Brunot Island stations in Pittsburgh. The estimated cost is $291 million with an in-service date of June 2012.

$450 million in upgrades are planned throughout the Mid-Atlantic and Dominion regions of PJM to handle power flows from a merchant transmission project between Ridgefield, N.J., and New York City. The merchant (i.e. non- utility) project would supply up to 670 MW of capacity from PJM to New York. The developer is responsible for the costs of the upgrades.

A larger transformer and a spare unit are to be installed at the Kammer Substation near Moundsville, W.V., by June 2009 at a cost of $42 million. The Kammer transformer is critical to power transfers across PJM. In addition, the cost of congestion on the facility has totaled more than $220 million since 2005.

The updates to PJM's regional plan also include $650 million for the interconnection of new generation totaling 6,334 MW. Through PJM's regional planning process, 19,912 MW of new generation have been interconnected, and 4,547 MW of generation is now under construction.

PJM's Regional Transmission Expansion Plan includes upgrades and new projects to maintain system reliability and to interconnect new electric generation. PJM has a 15-year planning horizon. The plan considers the growth and changes in the broad, multi-state region. By not being limited to considering just one utility's service territory, the PJM planning process can determine the most effective and cost-efficient transmission solution no matter where it is located in the region

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues