Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Inauguration Celebrates First Power Link Between Baltic States and Finland

An inauguration ceremony of the first power link between the Baltic States and the Nordic countries took place simultaneously in Estonia and Finland on December 4, 2006.

The Estlink submarine cable, built in record time, connects the Harku 330 kV converter station outside Tallinn and the Espoo 440 kV converter station near Helsinki, linking, for the first time in history, the electricity markets of the Baltic States and the Nordic countries.

The Estlink submarine cable is one of the priority projects in the European Union’s plan to ensure a continuity of supply in the power system, improve cross-border power infrastructure and help create more efficient power markets in Europe. It is the first common project between Baltic and Finish energy companies and cost a total of 110 million euros. The cable was built mainly to provide the Nordic countries with electricity produced in the Baltic States.

It was inaugurated in the presence of executives from utilities that own the link - Eesti Energia, Latvenergo, Lietuvos Energija — as well as Pohjolan Voima and Helsingin Energia of Finland; EU Energy Commissioner Andries Piebalgs; President and CEO of ABB Fred Kindle and representatives of the Estonian, Finnish, Latvian and Lithuanian governments.

"Today we made history. We have, for the very first time in history, connected power grids of the Baltic States and Finland," said Indrek Aarna, Chairman of the Management Board of Nordic Energy Link. “The building of the cable is finished and we hope to start with the commercial operation as soon as the final tuning of the cable has been conducted by ABB,” added Aarna.

Chairman of the Supervisory Board of Nordic Energy Link and CEO of Eesti Energia Sandor Liive emphasized the significance of further connections in the region and has underlined a prerequisite for a functioning electricity market. "Only when the Baltic power grids are fully connected to Northern and Western Europe may we acknowledge a functioning electricity market in the Baltic States."

The importance of the project lies, primarily, in the improved security of electricity supply in the Baltic States. Estlink allows for electricity trade and provides an alternative electricity purchase channel to cover potential deficits in generating capacity.

"Estlink is more that an energy feat," said ABB President and CEO Fred Kindle. "It brings the EU closer to the goal of creating a European electricity network, and extends the benefits of a reliable power supply with low environmental impact."

ABB designed, built and installed in two parallels the 105-km (65-mile) underground and submarine link using its HVDC (High Voltage Direct Current) Light technology. HVDC Light is an advance technology, offering secure power control and quick power restoration in the event of a blackout. Similarly, the technology is environmentally friendly, featuring oil-free cables, no electromagnetic fields, compact converter stations and underground or submarine power lines. The submarine cable is 350 MW and +/- 150 kV DC and will be run from control centers in Harku and Espoo.

Nordic Energy Link was established with the main objective to construct and operate the Estlink cable. In July 2004, the three Baltic power companies Eesti Energia, Latvenergo, Lietuvos Energija, as well as Pohjolan Voima and Helsingin Energia of Finland signed the Shareholders’ Agreement of a joint undertaking for the submarine cable Estlink between the Baltic States and Finland.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues