Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

PPL Electric Utilities Moves into New Phase of Scranton Transmission Line Rebuild Project

PPL Electric Utilities said it is moving into a new phase of the transmission line replacement project in Scranton, Pennsylvania that began earlier this year. The company is in the midst of rebuilding three older transmission lines in the City of Scranton as part of an ongoing, longer-term regional plan to strengthen the aging electric infrastructure and ensure reliability for area customers.

The $7 million Stanton-Providence project began in April and will likely be completed in spring 2011. Built more than 70 years ago, the line was in need of replacement to meet the current and future electric needs of the city.

The project involves replacing 8 mi of existing 69-kV power lines with new utility poles and upgrades to the two local substations that supply power to part of the Scranton community, primarily east of Route 11. Also planned are upgrades to local distribution facilities in the area to improve service.

The construction does not involve installation of a new power line, like the planned Susquehanna-Roseland transmission line linking Pennsylvania and New Jersey. It is a replacement of existing lines that will operate at the same voltage as they have since the 1940s. And there are no plans to raise the voltage level of the lines.

Overall the company is taking down 70 old wooden structures and replacing them with similar wooden utility poles along the same utility right of way. In limited cases, steel structures are being installed for extra strength and durability. All of the new poles are somewhat higher, about 10 to 20 ft, to conform to modern electrical code. PPL Electric Utilities is working with other utilities as well to transfer telephone and cable facilities from the old structures to the new poles.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues