Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Southwire HV Solutions Installs Its Longest 230-kV System

Public Service Company of Colorado (PSCo), an Xcel Energy Company, contracted Southwire HV Solutions to provide and install a completely functional 230-kV, XLPE transmission cable system on its Sandown-Leetsdale circuit in Denver. The project included material, labor, project supervision and cable installation equipment.

Southwire supplied and installed 86,284 ft of 2500 kcmil segmental conductor cable, 30 splices, 6 terminations, as well as link boxes, clamps and associated hardware. The completed system was tested with a 24-hour AC soak test. During the 24 hours, Southwire provided Partial discharge (Pd) measurements on all accessories, which passed Xcel Energy's requirements for Pd levels.

The installation route went through a highly congested residential area within the City and County of Denver so coordination between Xcel Energy and Southwire was critical. The duct bank was constructed in the road right-of-ways, requiring permits for lane closures during pulling and splicing operations. Staging areas housed the many large steel reels needed for insulated transmission cables. Accessories that were packaged in crates and boxes also had to be stored to protect the material prior to installation from the harsh weather.

An aggressive installation schedule was used throughout the project. Southwire responded by providing a cable pulling crew and two jointing crews to work in parallel. The installation took place during Denver's winter weather, so crews coped with several snow storms and days with daytime temperatures that were only in the teens.
Southwire and Xcel Energy have partnered on several underground transmission projects and continue to share successes.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues