Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Midwest Stand-Alone Transmission Co.’s, Wolverine File Regional Cost Sharing Proposal

The Midwest stand-alone transmission (MSAT) companies, including American Transmission Co. (ATC), ITCTransmission and Michigan Electric Transmission Company, LLC (METC), joined by Wolverine Electric Power Cooperative, filed with the Federal Energy Regulatory Commission a new regional cost allocation proposal for new transmission facilities at or above 345 kV. The proposal will aid in facilitating the construction of the regional backbone transmission infrastructure. A stronger regional grid will better serve the regional energy marketplace and help in getting renewable energy from the west into the Midwest Independent Transmission System Operator (Midwest ISO) market – a key issue at a time when state policy changes are requiring utilities to increase their use of renewables. The proposal does not affect existing facilities or lower-voltage lines as those facilities generally provide benefits that are more localized in nature.

Current policy using a “license plate” rate design – allocating the costs of transmission facilities to customers in the pricing zones in which the transmission facilities are located – operates as a natural disincentive to invest in regional transmission. The MSATs and Wolverine believe increasing the “postage stamp” cost allocation from 20 percent to 100 percent for new 345-kV lines and greater will spur interstate transmission investment.

“This pricing proposal, if approved, will be the enabler of high voltage regional transmission facilities which will bring about greater efficiency in wholesale markets and better integrate renewables and other generation resources,” said Joseph L. Welch, president and CEO of ITCTransmission and METC parent company ITC Holdings Corp. (NYSE: ITC).

Dale Landgren, vice president and chief strategic officer for ATC, said, “The fact is regional facilities have not been built using historical license plate rate design. We agree with FERC Commissioner Suedeen Kelly, who has said that the current cost allocation methodologies have not gone far enough to encourage the development of a regional grid that can deliver the consumer benefits of more regional competitive generation.” Kelly stated in her concurrence with the FERC’s July 23, 2007, Regional Expansion Criteria and Benefits (RECB) Order, “…my feeling has been that a higher level of socialization was probably desirable, primarily because of the public interest in healthy competition in generation. In other words, it is better to spend a little more on transmission if it will spawn even larger savings in generation.”

The MSATs and Wolverine made the filing to fulfill requirements of the Midwest ISO that called for a re-evaluation of the current rate structure at the conclusion of a six-year transition period, which ends on Jan. 31, 2008. The MSATs and Wolverine met with a number of stakeholders including several commissioners in Midwest ISO states, using their feedback to formulate the proposal. The proposal seeks to have a new cost allocation be effective Feb. 1, 2008, for all qualifying transmission facilities approved in the Midwest ISO planning process after Aug. 1, 2007. The MSATs and Wolverine also requested that the date for comments on the proposal be set at Sept. 16 (rather than the normal 21 days) to give state commissions within the Midwest ISO footprint more time to review and consider the proposal.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues