Service Improvements Under Way in Suffield, Connecticut
As part of its ongoing efforts to improve its electrical distribution system throughout Connecticut, The Connecticut Light and Power Co. (CL&P) is upgrading the system in Suffield. The $115,000 project, which is under way, will improve reliability for customers throughout the area. The work, scheduled to be completed by the end of June, includes:
- Upgrading equipment on poles to minimize the possibility of outages;
- Tree trimming will also be done on these streets. Tree-related outages are the number one cause of power outages, and regularly scheduled trimming is needed to reduce service interruptions. Trimming is also necessary to provide sufficient working space so line workers can maintain a safe distance from the power lines when repairing them;
- Installing additional equipment that will isolate any problems from the rest of the area.
“With the successful completion of this work, our Suffield customers will have a stronger, more reliable system to meet their current and future needs," said Bob Coates, director of Central Division Operations for CL&P. “These improvements are part of the nearly $3 billion investment in our infrastructure we are making across the state over the next five years.
Want to use this article? Click here for options!
© 2012 Penton Media Inc.
Acceptable Use Policy
Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.
General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.
blog comments powered by Disqus
















