Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

New Cable Link between Beilen and Hoogeveen, The Netherlands

Dutch national grid operator TenneT is planning to construct a new 110-kV cable link between Beilen and Hoogeveen. The cable is needed to realize a further expansion of the high-voltage grid in the region, and is part of the program of infrastructural upgrades TenneT is planning to complete in the north of the Netherlands over the coming years. The new connection will be constructed entirely underground.

An increasing number of bottlenecks has appeared in the high-voltage grid in recent years. Within the last two years alone, TenneT has received several requests for the connection of new generating stations to the Dutch 380-kV grid. Coastal production sites are becoming ever more important, not least at Eemshaven. Moreover, there is increasing concern for sustainability in energy production, involving the use of new fuels such as biomass.

TenneT is therefore working to expand the high-voltage grid in the north of the Netherlands. As part of this effort, the high voltage line on the entire Vierverlaten-Zeijerveen-Hoogeveen-Zwolle grid section is being upgraded in the coming years. In addition, TenneT and the national government have started the planning procedures required to construct an entirely new 380-kV line from Eemshaven to the loop in the central part of the Netherlands.

The new cable link will be constructed between the existing high-voltage substations at Beilen and Hoogeveen. TenneT will be making use of local knowledge and experience during the installation process, so that we can take the various interests into account wherever possible. Throughout the process we will collaborate closely with all the parties involved, including municipal authorities and land owners.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues