Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Construction of High-Voltage Cable between Haaksbergen and Hengelo to Start in March

In March, TenneT is to start work on the new high-voltage connection between Haaksbergen and Hengelo, The Netherlands. The 110-kV cable will be installed entirely below ground and will structurally enhance the security of supply in the Haaksbergen region in the North-East of the Netherlands.

Over the past few months, TenneT has consulted closely with local land owners in order to reach agreement on the construction of the new cable between Haaksbergen and Hengelo. The cable will serve as a back-up for the connection between Haaksbergen and Goor, and will also strengthen the spur network in the Twente region (the Eastern part of the province of Overijssel). This is important as industrial activity in Twente is on the increase, and demand for electricity is rising. The actual installation of the 13-km cable will begin in March.

The cable is to be tested in the autumn of this year and the new connection is scheduled to enter service in early 2010. The connection consists of three separate cables which will be laid side by side at a depth of approx. 2 m. A trench will be excavated along most of the route (some 11 km) for the cables to be laid in. Boreholes will be drilled at some locations, e.g. where the cable intersects with roads or waterways.

Haaksbergen municipality has been affected by several power failures over the past years. The town is connected to a so-called ‘spur’ of the electricity grid. On several occasions, disruptions in the nearby high-voltage grid resulted in the Haaksbergen and Eibergen substations being without electricity for a considerable period of time.

As a result of these events, TenneT decided to conduct a survey into the possibilities for expanding the high-voltage grid in the region. The survey revealed that the realization of an additional connection will increase the security of supply for Haaksbergen as well as strengthen the high-voltage grid in Twente. TenneT, which has been responsible for all high-voltage grids of 110 kV and higher since January 2008, is currently examining whether it can optimize more spur connections in the future.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues