Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Cables Laid Below Caland and Nieuwe Waterweg Canals, The Netherlands

TenneT has started modifying the underground waterway pass below the Caland and Nieuwe Waterweg canals. This 2-km long underpass will be converted into a 380-kV connection over the coming months. Work is expected to be completed by early 2010.

In 2004 drillings were carried out underneath the two canals, whereupon a 150-kV cable was placed in operation. This cable will be converted into a 380-kV connection in the next few months. The cables running below the two waterways have a total length of more than 2 km. The cables below the Caland canal are 850 m long, while the connection below the Nieuwe Waterweg canal is 1350 m in length.



Randstad 380 kV
The work currently being carried out is part of the construction of an entirely new 380-kV high-voltage connection across the Randstad conurbation, the highly urbanised western part of the Netherlands. In the next few years, a new electricity connection will be constructed between Wateringen and Beverwijk for this project, which is known as ‘Randstad 380 kV’. In addition, several existing high-voltage lines, such as the one between Hook of Holland and Wateringen, will be modified to allow for transmission of electricity at a voltage level of 380 kV.



The new connection is needed because the demand for electricity transmission in the Randstad conurbation is expected to rise considerably in the next few years. The construction of new homes and businesses, developments in the ICT sector, modern production methods in the greenhouse horticulture industry and the growing use of household appliances all contribute to an increase in electricity consumption. Furthermore, several power stations are under development at the Maasvlakte site, and a new subsea cable to the UK (known as BritNed) is being constructed.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues