Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.


  

TenneT Presents New Innovative Pylon Design

TenneT has developed a new concept for high‑voltage lines with a magnetic field intensity that is significantly lower than that of existing lines. The innovative design is called Wintrack and consists of pairs of slender pylons from which the high-voltage wires are suspended. Thanks to the new pylon, optimum use can be made of the space available around high‑voltage lines. TenneT intends to apply this innovative pylon at various locations throughout the Netherlands, including in the Randstad region, where work is currently underway on a major expansion of the high‑voltage grid.

In the fulfilment of its duties, TenneT tries to find a balance between a reliable electricity supply in the Netherlands, the associated costs and TenneT’s social responsibility in its capacity as grid administrator. The development of the new Wintrack concept, together with the independent research agency KEMA, offers TenneT more opportunities than before to arrive at the best possible solutions in concrete situations – in technical, economic and social terms.

The high-voltage conductors are suspended closer together than in traditional high-voltage pylons, thus reducing the intensity of the magnetic field generated along the line. The design consists of a pair of slender, tapering pylons that appear as visually distinct elements. Thanks to their design, the pylons can be integrated into the landscape in an attractive manner. The pylons are also easy to maintain thanks to their simple structure and smooth surfaces.

The Wintrack project is also important because the Dutch Ministry of Housing, Spatial Planning and the Environment drew up strict guidelines in 2005 for the extension of high-voltage lines and the construction of new buildings near existing high-voltage lines. The Ministry’s precautionary policy is aimed at minimizing long-term human exposure to magnetic fields generated by high-voltage lines. TenneT follows this policy and will ensure that the limit value of 0.4 microTesla defined by the Ministry is not exceeded. With respect to high-voltage lines of 380 kV, the directive stipulates that no new buildings may be erected on a strip of land of approximately 300 m around these lines. With the new Wintrack pylon, however, this strip can be reduced to less than 100 m.

The Wintrack pylon will be used in the new Randstad 380 line, which runs from Wateringen to Beverwijk. This line will be constructed in stages from 2009 onwards. The Wintrack pylons will be tested extensively in the first half of 2008.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.

T&D TV

Most Read


Find Other Popular Items

Community

T&D World TV


Thomas & Betts - Collaboration. Commitment. Customer-Focus: Our promise to you. With over 50 years of pioneering design expertise and a partnership approach to every project, Thomas & Betts has a well-earned reputation as an innovator and a problem solver. Watch Now »


Siemens - Covering the entire spectrum of energy automation. Watch Now »

Podcasts

Building a Smarter Grid: Managing Assets to Improve Utility Decision Making
Sponsored by ABB
Join Greg Scheu, President and Head of Power Products for ABB, and Rick Bush as they discuss how utilities can extract more value from existing grid infrastructure by managing the overall assets of the T&D operation. Listen Now »

More from Building A Smarter Grid


Electromagnetic Pulse Discussion with Eric Hsieh
NEMA Government Relations Manager Eric Hsieh discusses an EMP and its possible effects on the electric grid.

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues