Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Agreement to Build Wateringen Switching Station in The Hague

The De Vijvers residents’ association, national grid operator TenneT and the municipality of The Hague have agreed on several modifications to the original plan for the new high-voltage substation to be built near the Wateringse Veld residential district in The Hague. TenneT will make a number of changes to the substation, including partial rearrangement of the site. In exchange the residents’ association and municipality will discontinue legal proceedings against construction of the substation.

Following intensive negotiations over the past weeks, the parties reached agreement on what for the residents will be the improved spatial embedding of the planned 150/380-kV substation. Provisions in the agreement include demolition of the existing aboveground high-voltage pylons that run through the ecological zone alongside the residential district towards Rijswijk. An underground cable will replace them. Additionally, two of the six 150-kV transformers to be built will be installed at a different location on the site, further away from the residential district. TenneT has also agreed not to build anything on the northwestern side of the substation for the coming ten years. The parties are still consulting on what will be done with the space freed up at the Wateringen substation. They are also jointly exploring where in the vicinity the four remaining 150-kV transformers will be built.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues