Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Transpower Considering HVDC Replacement Options

Transpower, New Zealand, will begin the first vital stage of replacing Pole 1 of the High Voltage Direct Current (HVDC) inter-island link when it begins public consultation on the short-listed replacement options.

The HVDC link consists of Pole 1 and Pole 2.  Pole 1 includes equipment that is 42 years old and has been stood down pending work to return half of the Pole to a standby state for use in critical periods.    Pole 2, which was commissioned in 1991, continues to operate reliably and has been uprated to carry additional electricity since Pole 1 was stood down.

Transpower has assessed the short-listed replacement options under the Electricity Commission’s Grid Investment Test to determine a preferred option.  That assessment shows that a 700-MW replacement pole is preferred compared to the other short-listed options which include a new 500-MW pole or a new 1000-MW pole.

Transpower’s Chief Executive Patrick Strange said that Transpower will now consult on the results, as required by regulation.

“We are looking to the future and want to progress the HVDC replacement as quickly we can.  However, this is a major transmission investment, and discussion with industry and other interested parties will help ensure that we have reached the right answer. 

“What the Grid Investment Analysis has shown is that a Pole 1 replacement stacks up economically.  The benefits by way of facilitating competition in generation and connecting renewable generation are significant, and this shows up in all three new pole options.”

All documentation, including the results from the Grid Investment Test, the assumptions and option selection process will be available from the Grid New Zealand website www.gridnewzealand.co.nz after 1 February 2008.

When the current round of consultation is completed on 4 April 2008, Transpower will consider all submissions with a view to submitting a final HVDC replacement investment proposal to the Electricity Commission in May 2008.  Assuming the proposal is approved, a new pole would be commissioned in 2012.

Transpower continues work to restore half of Pole 1 to an acceptable operational state as back up during times when the supply of electricity is constrained.  This would help maintain security while the new Pole was being built.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues