Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Utilities Seek Approval of Three Major Transmission Lines

A group of regional utilities today asked Minnesota regulators to approve construction of three major transmission lines to ensure customers continue to enjoy reliable access to low-cost electricity and to increase access to renewable energy sources.

“The 345-kV lines proposed by the CapX 2020 utilities will help ensure continued reliable electricity service in Minnesota and the surrounding region by upgrading and expanding the high voltage transmission network that is the backbone of the region’s electricity system,” said Terry Grove of Great River Energy, a co-leader of the CapX 2020 effort. “Additionally, the lines will strengthen the network so that more wind energy resources can be developed in southern and western Minnesota and eastern North Dakota and South Dakota.”

The CapX 2020 utilities – an alliance of 11 electric cooperatives, municipals and investor-owned utilities – asked the Minnesota Public Utilities Commission to determine the new high-voltage lines and associated projects are needed. CapX 2020 is short for Capacity Expansion needed by 2020.
The proposed lines would span more than 600 miles and represent one of the largest single transmission initiatives in the region in decades. The approximate lengths and general locations of the proposed lines are as follows:

-1. A 200-mile, 345-kV line between Brookings, S.D., and the southeast Twin Cities, plus a related 345-kV line between Marshall, Minn., and Granite Falls, Minn.;
. A 250-mile, 345-kV line between Fargo, N.D., and Alexandria, St. Cloud and Monticello, Minn.;
. A 150-mile, 345-kV line between the southeast Twin Cities, Rochester, Minn., and La Crosse, Wis.

Following a rigorous public process, the commission is expected to decide whether the lines are needed by early 2009. If the commission decides the projects are needed, it will determine routes for the new lines in separate proceedings. Portions of the lines also will require approvals by federal officials and by regulators in North Dakota, South Dakota and Wisconsin.
As soon as regulatory need and routing decisions are complete in 2009 or 2010, construction will get under way, and the lines are expected to be completed three or four years later.

“In July we mailed information about the lines to nearly 500 local government officials and approximately 73,000 landowners in three proposed study corridors,” said Laura McCarten of Xcel Energy, a CapX 2020 co-leader. “We will work closely with all stakeholders to determine the best routes for the lines if the commission determines they are needed.

“Public meetings will be held in the potentially affected communities to describe the projects and answer questions. We will post information about the projects and updates on the CapX 2020 Web site at www.capx2020.com, and we will begin building mailing lists to keep people informed as the long regulatory process unfolds.”

“We look forward to working with everyone involved to determine whether the lines are needed and, if so, their routes,” Grove added. “We encourage everyone to participate by attending open houses and public meetings and providing information to the commission and the CapX 2020 utilities.”

While Great River Energy and Xcel Energy are taking the lead on the three 345-kV lines, other utilities also will be involved in permitting, building and financing them. A fourth line – a 230-kV, 70-mile line between Bemidji and Grand Rapids in north central Minnesota – also is among the CapX 2020 Group 1 projects. The utilities plan to ask the Minnesota commission to approve the fourth line in a separate filing later this year.

The first four projects represent a combined investment of approximately $1.4 billion to $1.7 billion.

Along with Great River Energy, Elk River, Minn., and Xcel Energy, Minneapolis, utilities or groups that expect to participate in one or more of the CapX 2020 projects are: Central Minnesota Municipal Power Agency, Blue Earth, Minn.; Dairyland Power Cooperative, La Crosse, Wis.; Minnesota Power, Duluth, Minn.; Minnkota Power Cooperative, Grand Forks, N.D.; Missouri River Energy Services, Sioux Falls, S.D.; Otter Tail Power Company, Fergus Falls, Minn.; Rochester Public Utilities, Rochester, Minn.; Southern Minnesota Municipal Power Agency, Rochester, Minn., and Wisconsin Public Power Inc., Sun Prairie, Wis.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues