Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Texas Variable Frequency Transformer Installation Dedicated

A new state-of-the-art Variable Frequency Transformer (VFT), a key component in a 138-kV electric interconnection between Laredo and Mexico was dedicated May 18, at the Laredo VFT substation. Texas Secretary of State Roger Williams made keynote remarks at the formal dedication.

The $74 million unit and related facilities are proposed assets of Electric Transmission Texas LLC, a joint venture between American Electric Power and MidAmerican Energy. The VFT will improve reliability in the Laredo area and substantially decrease the need to operate expensive Laredo area power generation, which has been designated "RMR" (reliability-must-run) by agreement between the generation owner and the Electric Reliability Council of Texas (ERCOT).

Combined with a new 345-kV transmission line approved by ERCOT to be completed in 2010, these facilities will allow the shutdown of the Laredo generation and support the 3-4 percent annual load growth in the Laredo area.

From now until the 345-kV line is completed, the Laredo area needs an additional 138 kV source of power. AEP and Mexico´s Commisión Federal de Electricidad (CFE) have an existing 138-kV transmission line and have just completed a new 230-kV double circuit transmission line. The VFT technology provides a controlled transmission path between the ERCOT and the CFE electrical grids, permitting power exchange that was previously impractical due to asynchronous boundaries.

“The VFT enhances grid stability for both the Texas and Mexican power systems and will be used to provide emergency support in addition to the transactional transfer of power,” said Calvin Crowder, ETT executive director. “It uses the latest technology to relieve transmission constraints and support the significant growth in an important economic region.”

Compared to the other options considered, the VFT will provide the highest degree of flexibility in scheduling power transfers in high load periods prior to completion of the 345-kV line, while maintaining a reliable power supply for the Laredo area.

As part of this project to interconnect the VFT to the CFE system, AEP and CFE are replacing the existing 138-kV transmission line with a new 230/138 kV double circuit transmission line.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues