Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Dominion Virginia Power Files Application to Build Transmission Lines In Southeastern Virginia

Dominion Virginia Power has applied to the Virginia State Corporation Commission (SCC) for permission to build two transmission lines — a 500 kV line and an associated 230 kV line — in southeastern Virginia to meet the increasing demand for electricity in Hampton Roads.

The SCC is responsible for approving the need for and route of all transmission lines of 150 kV and higher in Virginia. This project, which is estimated to cost $223.9 million, needs to be in service by the summer of 2011.

If approved, the 500kV line would extend about 60 miles from the company’s Carson Substation in Dinwiddie County to its Suffolk Substation near Suffolk, crossing Prince George, Sussex, Southampton and Isle of Wight counties. The lines are needed to meet the growing demand for electricity in south Hampton Roads and the Outer Banks of North Carolina.
The associated 230 kV power line would be about 21.5 miles long and be constructed within an existing right-of-way from the Suffolk Substation to the Thrasher Substation in Chesapeake.

New 500-230 kV transformers will be added at the Suffolk Substation. The Carson Substation and the Thrasher Substation will require expansions. Dominion plans to expand the Suffolk Substation in another project in 2009, so there will already be space for the addition of transformers included with this project.

"Dominion has an obligation to provide reliable and economical electric service to our customers, now and in the future," said John Smatlak, vice president-Electric Transmission. "These new lines are necessary to ensure continued reliable electric service to residences and businesses in a broad geographic area that is heavily dependent on the transmission system."
The SCC will set a schedule for public hearings. Dominion sponsored a series of public workshops in October 2006, during which residents in the study area provided information about various route segments that Dominion considered in its process.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues