Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Applications Submitted for Consent to Develop Western Isles Electricity Connection

Scottish Hydro Electric Transmission Limited (SHETL), a subsidiary of Scottish and Southern Energy (SSE), has today submitted applications to the Comhairle nan Eilean Siar, the Highland Council, Scottish Ministers and other statutory authorities to develop an electricity transmission connection between the Western Isles and the north west of Scotland.

In October 2004, SHETL asked for views on possible route corridors within which to develop a new high voltage electricity transmission line, to accommodate output from renewable energy schemes, which were proposed on the Western Isles. Following this preliminary consultation process, SHETL decided to undertake further environmental and technical work in respect of two possible route corridors.
SHETL gave a commitment in February 2005 to examine possible options for locating the new connection from either Ullapool to Beauly or from Melvich/Dounreay to Beauly and also to examine the possibilities for underground HVDC transmission. In December 2006, SHETL published a new consultation document outlining that the preferred option for the connection included an underground cable between Beauly and Ullapool.
The applications submitted now follow the publication earlier this year of the indicative proposed routes for the various elements of the transmission infrastructure associated with the Western Isles Connection. The key points of which were:

Confirmation that the preference expressed within the Consultation Document for the subsea route remained unchanged. The route was used as the centerline for a seabed survey last year. Following this survey, an indicative proposed route (IPR) was selected.

The IPR for the mainland section remained an underground cable between Little Loch Broom and Beauly Substation. The route had been adjusted in a number of areas and had been subject to an environmental assessment.

The indicative proposed location for the mainland converter station remained alongside the existing Beauly Substation.

The indicative proposed location for the converter station on the Isle of Lewis remained near Grabhair although it had been moved further away from the public road. Andrew Robertson, Scottish and Southern Energy’s Project Manager, said: “Over 700 organizations and individuals have participated in the voluntary public consultation process that we have undertaken. “We believe that we have selected the optimum route for the connection including considering the issue of undergrounding. We have, wherever possible, taken account of all views expressed and have recognized the concerns of the local communities.”

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues