Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Regulators Approve WMECo Transmission Upgrade for Greater Springfield Area Grid

Western Massachusetts Electric Company (WMECo) has received approval from the Massachusetts Energy Facilities Siting Board (EFSB) for the Greater Springfield Reliability Project (GSRP), a transmission upgrade designed to strengthen the region’s power grid, meet mandatory reliability standards, and allow power to move more freely around the greater Springfield and north-central Connecticut area. The Connecticut portion of the project received siting approval in March 2010.

“The EFSB’s recent decision on GSRP paves the way for construction to start later this year,” said Peter Clarke, President and Chief Operating Officer of WMECo. “In addition to its reliability benefits, this project supports the region’s economic health by improving access to markets for electric suppliers and enhancing access to lower-cost and renewable energy resources,” he said.

The company estimates the cost of GSRP to be $714 million but the total cost is currently being evaluated in light of the decision. The project includes work along 39 mi of an existing transmission right-of-way between Ludlow, Mass., and Bloomfield, Conn. The 27-mi portion in Massachusetts includes 23 mi of new 345-kV transmission lines, new and reconstructed 115-kV lines, two new switching stations and several substation upgrades. In Connecticut, there are 12 mi of new 345-kV transmission lines and a major substation expansion.

Work on the project will start in Massachusetts later this year at a new switching station in Springfield, with overhead line construction expected to begin in early 2011. In Connecticut, overhead line construction is scheduled to begin in late 2011. The project is expected to be in service in 2013.

GSRP is one of four transmission projects called the New England East-West Solution (NEEWS). Together these projects strengthen the reliability of the power grid within the regional transmission system by ensuring that national and regional reliability standards are met.

For additional information, visit www.NEEWSprojects.com.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues