Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

ABB Helps Keep Power Flowing in Southern Alberta

ABB has been awarded a contract in Langdon near Calgary by AltaLink, L.P., Alberta’s largest electrical transmission provider to initially replace certain components at risk of failure within AltaLink’s current Static Var Compensator (SVC), and during a second phase, to replace the existing unit with an entirely new ABB-designed and manufactured SVC system.

Static Var Compensators are sophisticated systems that provide the continuous reactive power required to control dynamic voltage swings which can occur under various conditions. In so doing, they serve to improve power system transmission performance. ABB completed Phase 1 of the service and supply contract for AltaLink this past December and has committed to putting the new SVC into service by November 2009.

“We recognized that our existing Static Var Compensator had reached the end of its life and that certain critical components were particularly at risk,” explains George Bowden AltaLink’s vice president of Operations “A failure of this vital link in southern Alberta’s transmission network could have led to a major blackout, inconveniencing thousands of Albertans and creating potentially significant financial consequences for the province’s ratepayers. We needed an immediate solution and looked to ABB to help us deliver.”

“We have a very positive, longstanding relationship with AltaLink, as well as a full understanding of the issues associated with the impending end of life of SVC systems,” underlines Greg Farthing, ABB Canada’s vice president of sales and marketing for Power Products and Power Systems. “Thanks to this extensive knowledge and expertise, we are pleased to have been able to mobilize the necessary source supply and our engineering facilities in Sweden and Montreal. Ultimately, we came up with an innovative two-step approach in accordance with a schedule that, frankly, many thought would not be feasible.”

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues