Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

ABB to Supply Products for China’s Highest-Voltage AC Power Line

ABB has won an order to supply products for the highest voltage alternating current (AC) power line ever built in China. ABB will supply the Xi’an XD Transformer Co., one of China’s largest power engineering contractors, with eleven 1,100-kilovolt (kV) bushings; key components of transformers and circuit breakers that increase the stability of high-voltage power transmission systems. The products will be installed on China’s first 1,000-kV AC power line, a pilot project in a larger program to deliver electricity generated in the north and southwest of China to power-hungry regions in the east.

“Industry is increasingly reliant on power generated in remote areas so there is a rising demand for efficient long-distance transmission systems,” said Bernhard Jucker, head of ABB’s Power Products division. “ABB has the expertise to deliver reliable power supplies with low environmental impact.”

Electricity consumption in China has been increasing at a rate of 15 percent a year since 2004 and, according to China State Grid Corp, the country’s largest power utility, an additional 500 GW of installed generating capacity will be needed by 2020. This rise in demand, which will be met by tapping hydropower resources in the southwest and fossil reserves in the northwest, exerts tremendous pressure on utilities to expand capacity and improve the reliability of supplies.

The 654-km power line, connecting Jindongnan in Shanxi province and Jingmen in Hubei province, is scheduled to start operations in 2008. The order is worth about $2.6 million to ABB.

Over the past 40 years, more than 1000 ABB transformer and reactor bushing units have been delivered for 765-kV grid systems across the world, including projects in North and South America, Central Europe, Africa and Asia. This represents around an 80 percent market share.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues