Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

ABB to Supply Two New Substations in Canada

ABB has received an order in excess of $50 million CAD from Manitoba Hydro to supply two new substations and upgrade four others as part of the Wuskwatim Transmission Stations complex in northern Manitoba.

The substations will help deliver power produced at the new 200-MW Wuskwatim Generating Station to the existing power grid, and will be energized in 2012. The order was booked in the first quarter of 2007.

ABB's advanced technologies and expertise will help Manitoba Hydro create new sources of power transmission and continue to provide reliable power to customers in Canada and the U.S. ABB’s gas-insulated switchgear (GIS) technology is ideally suited for this project, featuring best-in-class reliability and compact size.

“Manitoba Hydro awarded the contract to ABB because of our comprehensive understanding of their complex requirements, our ability to execute large projects, as well as the quality of our products, systems and solutions,” stated Sandy Taylor, President of ABB Canada.

The $1.3-billion project 750 km north of Winnipeg is an equity partnership between the Nisichawayasihk Cree Nation and Manitoba Hydro, the province's major energy utility, on a power generating station.

“Equipment and systems will come from ABB units in Canada, US, Sweden and Switzerland,” said Jean Guay, Vice President, Sales and Marketing, Front-End Sales, Canada. The package includes a 230-kV air-insulated substation (AIS) together with a static var compensation (SVC) system; a 230-kV gas-insulated switchgear (GIS) substation; the upgrade of four AIS substations and electrical protection and control systems using IEC 61850 technology.”

ABB will provide engineering, manufacturing, supply, and on-site staffing to supervise erection and commissioning.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues