Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

AESO Long Term Transmission Plan Reaffirms Need for Upgrades

The need for a significant investment in transmission infrastructure was reaffirmed with the release of the draft Alberta Electric System Operator's (AESO) 2011 Long-term Transmission Plan.

"The 2011 Plan provides efficient, reliable and cost effective solutions to meet the growing needs of Alberta's economy, including industries, business and household demand," says David Erickson, AESO president and chief executive officer. "It has gone through comprehensive internal and external expert analysis and development as well as thorough consultation with public stakeholders including industry, customers and government."

Designed to be a comprehensive, flexible and dynamic roadmap, the 2011 Plan outlines future transmission development required to meet forecasted growth, provide continued reliability, facilitate a fair, efficient and openly competitive market and support short and long-term economic development in Alberta. It is consistent with legislation, regulation and government policy.

The 2011 Plan relies on updated inputs to forecasts, economic trends, changing customer demand and regulatory requirements to identify system upgrades required over the next 10 years. The Plan validates the need for four projects previously identified as critical transmission infrastructure (CTI) by the Government of Alberta in 2009 as well as the major regional transmission projects required to meet future demands.

The total estimated cost for the projects identified in the 2011 Plan is $13.5 billion. Sixty per cent of the total cost, or $8.3 billion, relates to approximately 50 regional projects and supports more than 200 customer connection requests. The remaining forty per cent of the total cost, or $5.2 billion relates to the four CTI projects. To put this into perspective, for every $1 billion spent on transmission, the increased cost to the average residential consumer is about one dollar per month.

All of the regional projects have or will be subject to a two-stage regulatory review including fulsome consultation prior to proceeding. It should also be noted that no new CTI projects have been identified in the 2011 Plan.

"Demand for electricity has increased 32 per cent over the last 10 years with annual peak demand growth forecast to average 3.2 per cent over the next 20 years," adds Erickson. "The fact of the matter is that transmission capacity has not kept pace with load growth or generation development in the last decade and, as a result, we need to invest in upgrades today in order to maintain reliability of the system, now and into the future."

As part of its ongoing public education and consultation efforts, the AESO released the 2011 Plan as a draft to allow for input from Albertans prior to filing the final copy with the Alberta Utilities Commission. Interested parties can view a copy of the Plan and Executive Summary, as well as submit comments through the AESO's public engagement website, http://www.poweringalberta.com/.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues