Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

AREVA to Upgrade Interconnection Between France and England

AREVA’s Transmission and Distribution Division has been awarded a 70 million euros contract by National Grid and RTE, to enhance the reliability and reinforce the availability of IFA 2000, the world’s largest subsea High Voltage Direct Current (HVDC) scheme interconnecting the French and British national power systems.

AREVA will replace the existing high voltage converter equipment and the control and cooling system, implementing its H-400 high voltage direct current Thyristor valves and Series V control system in order to optimize the interconnector’s availability. The downtime on each circuit is limited to less than seven weeks.

Since its launch in 1986, IFA 2000 has significantly contributed to the development of the European electricity market and has been recognized as a technical success. Today, this interconnection is the means to efficiently transmit electricity between the two countries.

Philippe Guillemot, chairman and CEO of AREVA’s Transmission and Distribution division comments, “IFA 2000 has been a pioneering interconnection and a positive example of effective co-operation and partnership between European electricity companies. Our knowledge and experience of this interconnection dates back to 1986 when AREVA supplied the original HVDC converters. We are therefore extremely confident that we can provide the most appropriate solutions that will maximize the performance and efficiency of the scheme.”

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues