Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Multi-Country Shared Energy System Inaugurated in the Gulf

AREVA’s Transmission and Distribution division congratulates the Gulf Cooperation Council International Authority (GCCIA) on the successful inauguration of its North Grid system. This project brings state-of-the-art High Voltage Direct Current (HVDC) and Energy Management Systems (EMS) to the Gulf Region, in order to interconnect the power grids of the Gulf Cooperative Council member countries, marking a major milestone in the development of the Region.

The Phase one project has interconnected the northern countries of Kuwait, Saudi Arabia, Bahrain and Qatar, with the interconnection of United Arab Emirates and Oman to follow later during Phase two and Phase three projects.

AREVA T&D designed and built the 3-pole 1800-MW 400-kV HVDC Al Fadhili converter station in Saudi Arabia, and an integrated automation solution including e-terra Energy Management Systems (EMS) and substation MiCOM protection relays and PACiS control system for the entire six-country GCCIA network.

Essential to this system is the Control Center, located in Ghunan, Saudi Arabia, which manages the flow of energy not only to the new substations built for Phase one, but also manages the energy interconnection and exchange throughout each GCC member country.

The Al Fadhili HVDC converter station is the transmission connection that makes it possible for Saudi Arabia to share energy with the other member countries, despite asynchronous voltage levels (Saudi Arabia’s transmission system uses 380 kV 60 Hz, while the other countries use 400 kV and 50 Hz).

This mega-project involved 3,800,000 hours of erection, testing and commissioning on-site with no injuries. The teams included 900 construction and installation crew members and 60 testing and commissioning engineers and experts. Over 9,500 tons (26,000 m3) of equipment was supplied from 12 AREVA T&D production sites around the world.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues