Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Nepal Targets Overhaul of Power Network to Reduce Shortages, Boost Growth

Asian Development Bank’s (ADB) Board of Directors has approved a loan of $65 million equivalent to strengthen and expand Nepal’s electricity transmission and distribution facilities in a bid to cut network losses and reduce frequent supply interruptions and outages. Years of underinvestment in electricity infrastructure has left Nepal with one of the most unreliable power supplies in South Asia, putting a brake on the country’s economic growth.

Funds will also be used to upgrade two hydropower plants, introduce compact fluorescent lamps, and install solar and solar-wind powered streetlights in a push to boost energy efficiency, increase the use of clean renewable technologies, and take some of the strain off the national grid. Public-Private franchising partnerships will be developed in selected urban areas to improve service quality to consumers, providing a model that could be replicated in future.

The Energy Access and Efficiency Improvement Project will support the Government of Nepal’s long-term vision to provide universal coverage using grid-based and off-grid supplies by 2027. Installed generating capacity at the end of 2008 was 615 MW with just 33% of households connected to the national grid.

“The project will strengthen and increase supply capacity, increase consumer connections, improve the finances of the state-owned Nepal Electricity Authority, and eventually allow for increased cross-border energy trade, giving the economy a boost,” said Priyantha Wijayatunga, Energy Specialist in ADB’s South Asia Department.

An estimated 20,000 additional households are expected to directly benefit from the distribution improvements, while all 1.5 million grid-connected electricity consumers will receive more reliable power supplies. The installation of 1,000 solar and solar-wind streetlights in municipal areas of Bhaktapur, Kathmandu and Lalitpur will improve safety, particularly for women and children, while the project is expected to reduce an estimated 15,000 to 20,000 tons of carbon dioxide emissions annually.

ADB’s loan from its concessional Asian Development Fund covers 69% of the project cost of $93.7 million. The loan has a 32-year term, including a grace period of 8 years. Interest is charged at 1.0% per annum during the grace period and 1.5% per year for the rest of the term.

Grants totaling $4.5 million from the Climate Change Fund and Multi-Donor Clean Energy Fund, administered by ADB, will also be provided. The Government and Nepal Electricity Authority will supply the balance of $24.2 million. Nepal Electricity Authority is the executing agency for the project which is due for completion around September 2014.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues