Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

ATC Gets Approval for High-Voltage Connection to Regional Generation Sources

Following a year-long regulatory review, the Public Service Commission of Wisconsin gave American Transmission Co. its verbal approval to move forward with the construction of the Paddock-Rockdale project, a new high-voltage electric transmission line in south central Wisconsin. The new, 35-mile line, to be built largely on existing right-of-way, will extend an existing connection to Illinois and allow local electric distribution companies access to lower-cost power produced in the region. The savings will be passed on to end-use electricity customers under PSC regulations.

"This is the first transmission line project within the footprint of the Midwest Independent System Operator that is driven by economics," said Randy Satterfield, ATC vice president of Public Affairs. "Although enhanced reliability will be a by-product of the project, the primary benefit of this transmission line to the south comes from the ability of local electric utilities to benefit economically from the wholesale electricity market. This additional high-voltage connection will remove a significant constraint and enable access to lower-cost power in the region--and that translates to savings for electricity consumers."

As a net importer of electricity, Wisconsin utilities will gain flexibility in the wholesale market with the construction of the new 345-kV line. "The state's electricity generators generally produce less power than is used; the balance--about 15 percent on average--is imported from areas around the region. On any given day, it's not necessarily a matter of generation capacity," explained Flora Flygt, director of Planning for ATC. "It's a matter of economics. Sometimes the best price and availability on electricity is outside the state."

According to Flygt, getting the best deal on power is largely dependent on the transmission system. "Wisconsin utilities have been at a disadvantage compared to neighboring states because of the limited number of transmission line connections to other states," she said. "As the wholesale market and competition continues to evolve, it becomes even more critical that Wisconsin utilities can get cheap power or power from renewable resources for their customers."

Justifying the project economically came down to the numbers, explained Satterfield. "Almost without exception, the scenarios and models we evaluated demonstrate cost savings sufficient to cover the $133 million cost of the project," he said. Except for a slow economic growth scenario, (highly unlikely to persist for the entire 40-year life of the line) the present value potential of the net benefits as a result of constructing the Paddock-Rockdale project ranges from $82 million to $1.8 billion. The aggregate annual benefits available for all scenarios range from $7 million to $133 million.

The line will be built on an existing transmission line right-of-way between the Rockdale Substation in the Town of Christiana in Dane County and the Paddock Substation located in the Town of Beloit in Rock County. The existing transmission lines that extend south out of the Paddock Substation into Illinois create a path for importing power into Wisconsin.

The state's major utilities including Alliant Energy, Madison Gas & Electric, Wisconsin Public Service Corp., and We Energies, along Wisconsin Public Power Inc., testified in support of the project during PSC hearings earlier this year. "We know those benefits are real, and ATC's modeling does demonstrate that the project will clearly be economically justified," said Steve Kraus, MGE spokesperson. "MGE's ratepayers will benefit if we can increase the number of high-voltage transmission lines linking Wisconsin to our neighboring states."

Traditional transmission line projects have largely focused on reliability needs and weaknesses on the transmission system. Flygt said the recent restructuring of wholesale electric markets has highlighted the need for economic considerations to be a driving force in transmission planning as well. "An access project like Paddock-Rockdale, by reducing transmission congestion and increasing transfer capacity, will positively enhance wholesale generation competition."

"Timing is important. Our in-service target is 2010, which coincides with the expiration of some of the federal market protection for Wisconsin utilities that have been in place since the market was introduced in 2005," explained Flygt.

Over the life of the transmission line, the savings include:

  • Reduced generation costs, including fuel. This gives utilities flexibility when fuel prices fluctuate and allows utilities to choose from a greater array of regional generation options.
  • Reduced energy losses. High-voltage lines are more efficient and experience lower losses compared to lower-voltage lines.
  • Increased market competition. A more competitive market will help control and lower prices compared to a market where power purchase choices are limited.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

Autovation 2008

Utilimetrics: Alliance for Advanced Metering & Data Management Solutions (formerly AMRA) is planning a dynamic AMR/AMI conference. Autovation 2008: The Utilimetrics International Symposium, Sept. 7–10 in Atlanta, GA, will bring together AMR/AMI experts and key personnel for four days of the latest and most innovative utility automation strategies and technologies.

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • August Issue
  • July Issue
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue

Browse Back Issues