Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

ATC Files Application for First Transmission Access Project in Midwest

American Transmission Co. is proposing a project to construct a new 345-kV electric transmission line in south central Wisconsin on existing transmission right-of-way that will complete a connection to Illinois and allow local distribution companies access to lower-cost power produced in the region. The company yesterday filed an application with the Public Service Commission of Wisconsin seeking approval for the project between the Rockdale Substation in the Town of Christiana in Dane County and the Paddock Substation located in the Town of Beloit in Rock County.

The proposed power line, called Paddock-Rockdale, is the first access project within the footprint of the Midwest Independent System Operator (MISO) that is justified on economics. All transmission projects have elements of both reliability and economics. ATC’s projects in recent years have been constructed to address weaknesses on its transmission system and resolve reliability issues. “While enhanced reliability will be realized with the project, the primary benefit of the project is to provide our customers’ access to cheaper power in the region,” explained Flora Flygt, director of Planning for ATC.

ATC’s regulatory filing followed more than two years of analysis and evaluation. “We started this process with at least six possible access projects,” explained Flygt. The six possible projects were narrowed down to the Paddock-Rockdale project through an initial process involving extensive stakeholder input and an “Access docket” at the Public Service Commission of Wisconsin. “To further evaluate Paddock-Rockdale, we used a sophisticated approach that factored in different scenarios and drivers like fuel costs, new and retired generation, economic growth, and costs of environmental regulations. This process allowed us to quantify the costs and benefits of the project in a wide range of plausible futures.” The Paddock-Rockdale project performed very well from a cost-benefit standpoint under a variety of conditions and scenarios and will be built almost entirely on existing transmission line rights-of-way.

According to Flygt, in six of the seven scenarios studied, the new line could yield a 40-year net savings on the low end of $100 million and up to almost $1.0 billion on the high end. “A sluggish or unstable economy is the only scenario that would fail to provide cost savings sufficient to cover the cost of the project,” added Flygt. On an annual basis the savings could be between $7 million and $125 million.

Wisconsin has only limited transmission line connections to other states compared to its neighboring states. “This limits the ability of electric utilities to access wind energy or lower-cost sources of electricity from other regions,” explained Flygt. “Timing is important. Our in-service target is 2010, which coincides with the expiration of some of the federal market protection for our footprint. Supporting a more competitive market for utilities will translate to saving to consumers.”

The regulatory application includes two possible locations for the new 345-kV circuit, and both make use of existing transmission line corridors. The route that ATC has designated as its preferred route follows an existing 345-kV utility corridor. The route designated as the alternative route option follows existing 138-kV and 69-kV transmission lines, which run parallel to the existing 345-kV line two miles east. “Under state law, the PSC will review and consider both routes in the construction application,” said Flygt.

A decision from the PSC is expected in 2008 for the $133 million project. If approved, construction would begin in late 2008 and the line would be placed in service in 2010.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues