Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

BCTC to Invest $3.2 Billion in Transmission Network

British Columbia Transmission Corporation (BCTC) has filed with the B.C. Utilities Commission (BCUC) its third annual Capital Plan that anticipates investments of $3.2 billion in B.C.'s transmission assets over the next 10 years.

"The B.C. economy is growing rapidly and demand for electricity is increasing," said Jane Peverett, BCTC president and CEO. "This investment is required to operate the 18,000 km electricity grid that moves electricity around the province and to expand it to meet our province's current and future needs. Transmission infrastructure is a vital backbone of our growing economy and powers virtually every home and business in the province.”

BCTC is planning for the future by making the most of innovation by focusing on three areas that will increase the power transfer capability of existing assets, extend the life of assets and improve system reliability and security.

"As the manager of a complex and high-value transmission grid, BCTC is introducing technology innovations that provide improvements to the performance of the system and allow for a greater utilization of our existing assets," said Julius Pataky, BCTC Vice-President of System Planning and Asset Management. "With this plan, BCTC is leading the way to ensuring the province continues to benefit from one of the most advanced energy networks in the world."

BCTC's F2007/08 - F2016/17 Capital Plan outlines the capital investments for the next two years, and provides an outlook of potential investments through to 2017. The plan focuses on ensuring adequate transmission capacity to meet customer requirements and maintaining system performance and reliability. It is filed for approval with the BCUC which regulates the province's electricity utilities on behalf of B.C. ratepayers. Details of the capital investment plan are available at www.bctc.com.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues