Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

BPA Proposes Transmission Line Replacement Project at Grand Coulee Dam

The Bonneville Power Administration (BPA) invites members of the public to help identify environmental issues that should be considered before moving forward with a proposed high-voltage transmission line replacement project at Grand Coulee Dam in Washington.

BPA has been asked by the Bureau of Reclamation to design and construct six new 500-kV transmission lines at the dam to replace six existing underground lines. The underground lines need replacing because they consist of 18 aging, oil-filled cables that run between Grand Coulee Dam’s third powerhouse and the 500-kV spreading yard, both of which are operated and maintained by the Bureau of Reclamation. The new lines would transfer power generated at the dam’s third powerhouse, across the Columbia River to the visitor center area and then run uphill to where the lines will connect to existing lines to transfer power into the regional power grid.

BPA and Reclamation held an open-house style meeting for interested parties to gather input for an environmental assessment, a study of the proposed project’s potential impacts on the natural and built environment. The environmental assessment also would describe any mitigation measures that could be incorporated into the proposed project to minimize impacts.

”An important part of the planning process is interacting with the public to learn more about their transmission line siting concerns, as well as providing critical information to help citizens understand the rationale for the proposed line,” said Greg Delwiche, BPA vice president for Environment, Fish and Wildlife. Information on the proposed transmission project is available at www.bpa.gov/go/coulee.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues