Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Chongqing Electric Re-Conductors with 3M ACCR to Ensure Power Supply for Olympics

Chongqing Electric Power Corp. has become the second major utility in the People’s Republic of China to install the 3M Aluminum Conductor Composite Reinforced (ACCR) to boost transmission capacity on a key line without the need to build larger transmission towers. The utility says it needed extra capacity to meet anticipated heavy power demand for the summer Olympics in Beijing and did not have time to construct new towers.

This installation will serve more than a half-million residents within two districts in Chongqing City, an ancient city with a population of approximately four million, located on the Yangtze River in southwest China, within Sichuan Province.

In late 2007, Shanghai Electric became the first utility outside of the United States to install the 3M ACCR. Since then, utilities in Canada and Brazil also have chosen 3M’s breakthrough conductor to enlarge capacity on lines where new construction would pose economic or environmental problems. Fourteen utilities in the U.S. so far have deployed 3M ACCR, which can carry more than twice the power of conventional steel conductors of the same diameter.

Using existing towers, Chongqing Electric has installed a two-circuit line of approximately 3.4 miles (5.5 km), linking the Shuinian and Shuangshan substations. Chongqing is in a subtropical region with high humidity and frequently extreme summer heat, and 3M ACCR was chosen in part because of its proven reliability in difficult climates.

“This is one of the hottest cities of China, with monsoonal weather, and we required a conductor that could be relied upon to carry more current under those conditions, and could be installed quickly and reliably within the existing infrastructure,” explains Wang Xinkuan, chief design engineer for Chongqing Electric Power Corp. Installation required only two weeks, he adds.

“3M ACCR has been in use, both in continuous field tests and commercial operation, for several years and around the world, under a wide range of harsh climate conditions,” says Tim Koenig, director of the 3M High Capacity Conductor Program. “The conductor has met all performance and reliability expectations with no failures in the field, in either installation or operation.”

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues