Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Fingrid’s Capital Investment Decision on Submarine Cable Link to Estonia

Fingrid, the electricity transmission system operator in Finland, has made a capital investment decision concerning the second direct current transmission link, EstLink 2, between Estonia and Finland. The capacity of the planned transmission link is 650 MW and the costs of the project total approximately 320 million euros. The submarine cable will be built in cooperation with the Estonian transmission system operator Elering. The execution of the project still requires that the recently opened electricity market in Estonia starts off favorably and that the project receives an investment subsidy of 100 million euros from the European Union.

At present, there is one 350 MW direct current connection between Finland and Estonia. The new transmission link will raise the total electricity transmission capacity between the countries to approximately 1,000 MW, therefore integrating the Baltic electricity market closer to the Nordic market. The new connection will also increase the supply security of electricity in the Baltic Sea region. The goal is that the new link will be brought to commercial operation at the beginning of 2014.

Fingrid and Elering have been drawing up preliminary plans for the new submarine cable for about three years. EstLink 2 is one of the foremost reinforcements in the electricity transmission grid in the Baltic Sea region. The environmental, nature, water ecology and seabed surveys for the link have been completed for permit applications conforming to the Finnish acts on cross-border transmission lines and water construction.

The Commission of the European Union also considers the transmission connection between Finland and Estonia as very important, which is why it has proposed an EU subsidy of 100 million euros for the EstLink 2 connection. The potential subsidy is part of a broader recovery package of the EU, aiming to stimulate economic activity in the Union and also support the strategic energy policy objectives. The EU’s final subsidy decision is expected in the coming weeks.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues