Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.


  

GE to Auction Electric Transmission Capacity for New York City from Proposed NJ Transmission Project

GE Energy Financial Services announced that it will auction the electric transmission capacity from a proposed transmission project capable of increasing the power supply to capacity-constrained New York City.

The project will be a significant improvement to the regional transmission grid, transmitting power from the Pennsylvania/Jersey/Maryland Interconnection, the largest centrally dispatched electric grid in the world, to the NYISO grid serving the New York metropolitan area. The project will be able to transfer an incremental 300 MW of capacity from PJM to NYISO through an existing cable running in bedrock 60 ft beneath the Arthur Kill waterway -- originating at GE’s 900 MW Linden, NJ, cogeneration power plant and connecting to Consolidated Edison’s Goethals substation in the New York City borough of Staten Island.

NYISO, the New York Independent System Operator, a federally regulated, not-for-profit corporation operating New York’s bulk electric transmission system, projects that New York City’s peak demand will increase by 1,300 MW by 2016. Environmental constraints make siting power plants within New York City difficult and add to the cost of locally generated power. The project will provide access to economic sources of power within the PJM. Culminating with an auction expected in January 2007, GE Energy Financial Services will hold an open season to allocate transmission rights from the project. Interested parties may visit www.lindenvftauction.com or contact Brad Miller of CRA International (617-425-3384, bmiller@crai.com) to learn more about the proposed project, the open season process, as well as an informational meeting to be held in New York City. CRA International is managing the open season for GE Energy Financial Services.

The proposed project will consist of the design, construction, and operation of three variable frequency transformers (see artist’s rendition), using proprietary GE technology that enables a simple and controlled transmission path between electrical grids. The three variable frequency transformers will be installed at the Linden Cogen power plant, which GE Energy Financial Services purchased earlier this year.

“A reliable and proven technology, variable frequency transformers provide a unique way to transfer power from one electric network to another, taking advantage of our Linden Cogeneration plant’s strategic New Jersey location and transmission cable capacity -- to serve key New York metropolitan markets,” said Mark Mellana, a managing director for power at GE Energy Financial Services. “For New York City, this is an economic way to provide much-needed capacity.”
Construction of the Variable Frequency Transformer project is expected to begin in the second quarter of 2007, with completion in the fourth quarter of 2009.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.

T&D TV

Most Read


Find Other Popular Items

Community

T&D World TV


Thomas & Betts - Collaboration. Commitment. Customer-Focus: Our promise to you. With over 50 years of pioneering design expertise and a partnership approach to every project, Thomas & Betts has a well-earned reputation as an innovator and a problem solver. Watch Now »


Siemens - Covering the entire spectrum of energy automation. Watch Now »

Podcasts

Building a Smarter Grid: Managing Assets to Improve Utility Decision Making
Sponsored by ABB
Join Greg Scheu, President and Head of Power Products for ABB, and Rick Bush as they discuss how utilities can extract more value from existing grid infrastructure by managing the overall assets of the T&D operation. Listen Now »

More from Building A Smarter Grid


Electromagnetic Pulse Discussion with Eric Hsieh
NEMA Government Relations Manager Eric Hsieh discusses an EMP and its possible effects on the electric grid.

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues