Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.


  

AIR2’s Helicopter Barehand Work Crews Replace Damaged Dead-End Insulators on Energized Georgia Power 500-kV System

In the fall of 2004 AIR2 was approached by Georgia Power Co. to perform a specialized inspection on their 500-kV system to determine if there was a widespread problem with cracks that had been found in the bells of the insulators. The inspection quickly localized the problem to their 500-kV double dead end structures. The high power images from the inspection revealed hairline cracks that radiated out from the centers of the bells. Based on this inspection Georgia Power removed samples of these insulators and had them tested for structural and electrical strength.

The testing concluded that the cracked bells did not decrease structural strength. However, their insulating value was compromised. The insulators with cracked bells showed particular signs of electrical failure if there was a flashover incident. Georgia Power had already documented an insulator string exploding and attributed it to this problem. The inspection also concluded that the problem was localized to a particular insulator bell manufacturer, made in a single year. Georgia Power then decided to have all the structures that used those insulators changed as soon as possible.

The next problem was obtaining an outage on the critical 500-kV system. Because of the amount of work involved and the loading demand of the Georgia Power 500-kV system, it seemed impossible to get the work completed.

AIR2, LLC, a highly experienced helicopter transmission line construction and maintenance contractor, proposed performing the work under energized conditions. AIR2 had previously completed a hot insulator change on 230-kV I-string insulators for another utility. This work took place in early 2005 and was successful.

Georgia Power engineering and safety personnel and AIR2 personnel performed a thorough review of the procedures. AIR2’s hotstick/barehand trained line and flight crews then demonstrated their ability to safely perform this operation to Georgia Power personnel on the 500-kV system while deenergized. After these reviews and the demonstration, Georgia Power gave the project the green light. The photo shows the work in progress. The men have been transported to the structure and are on the structure using hot stick methods to install new insulators. The helicopter is departing with an old insulator on the end of a long line connected to the helicopter belly hook.

This work was performed in the 4th quarter of 2006 and 1st quarter of 2007 and was highly successful. This method offers a solution to many utilities faced with the same or similar problems with faulty insulators and difficulties obtaining outages.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.

T&D TV

Most Read


Find Other Popular Items

Community

T&D World TV


Thomas & Betts - Collaboration. Commitment. Customer-Focus: Our promise to you. With over 50 years of pioneering design expertise and a partnership approach to every project, Thomas & Betts has a well-earned reputation as an innovator and a problem solver. Watch Now »


Siemens - Covering the entire spectrum of energy automation. Watch Now »

Podcasts

Building a Smarter Grid: Managing Assets to Improve Utility Decision Making
Sponsored by ABB
Join Greg Scheu, President and Head of Power Products for ABB, and Rick Bush as they discuss how utilities can extract more value from existing grid infrastructure by managing the overall assets of the T&D operation. Listen Now »

More from Building A Smarter Grid


Electromagnetic Pulse Discussion with Eric Hsieh
NEMA Government Relations Manager Eric Hsieh discusses an EMP and its possible effects on the electric grid.

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues