Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Juan de Fuca Cable – Combined Interconnection Impact and Facility Study Completed

Sea Breeze Power Corp. reports the successful completion of the British Columbia Transmission Corp. (BCTC) Combined Interconnection Impact and Facility Study (the “Studies”) for the Juan de Fuca Cable Project.

The Studies were initiated in the spring of 2008 at a cost of $220,000, which was pre-paid, and are required by BCTC to assess the impacts resulting from the interconnection of the Juan de Fuca Cable into the BCTC-managed transmission grid.

The Juan de Fuca Cable is a 550-MW High Voltage Direct Current Light® submarine transmission line that will connect Vancouver Island and Washington State’s Olympic Peninsula. The Studies assess negative impacts, if any, on the current grid system brought about by the integration of the Juan de Fuca Cable.

Paul B. Manson, President & CEO, said: “The Studies support the fact that Juan de Fuca Cable will complement the existing grid and will add needed reliability, capacity and flexibility to transmission operations in the region. The Juan de Fuca Cable will strengthen British Columbia’s electrical reliability and will particularly ensure that Vancouver Island’s electricity needs will continue to be met”.

The Studies also report on any required upgrades needed to the electrical system. According to BCTC’s Studies, the cable would not result in any considerable steady state problems under both normal and contingency conditions and that the interconnection of the Juan de Fuca Cable to the BCTC system could be completed for approximately $3,129,000, the total cost to be borne by the project. The Studies are available to the public at the BCTC website (http://www.bctc.com/NR/rdonlyres/318AA3BB-CEB9-407A-AB8B-6337BE4A769F/0/JDFFinalReport.pdf).

Following the issuance of the US Presidential Permit last summer and the United States Army Corps of Engineers permit in the fall, the project is approaching the final stages of development.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues