Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Juan de Fuca Cable Files Draft EIS with U.S. Department of Energy

Sea Breeze Power Corp., on behalf of its affiliate, Sea Breeze Olympic Converter, LP, has filed a Draft Environmental Impact Statement (D-EIS) prepared for the Juan de Fuca Cable with the U.S. Department of Energy (DOE). The submission of the D-EIS, which was prepared by Bonneville Power Authority, is a significant permitting milestone in the United States for the Juan de Fuca Cable.

The Juan de Fuca Cable is a 550-MW High Voltage Direct Current (HVDC) Light® international submarine transmission line that will connect Vancouver Island and Washington State’s Olympic Peninsula. On September 7, 2006, the Juan de Fuca Cable became the first international merchant transmission line to gain approval from Canada’s National Energy Board.

Interested parties and the general public have the opportunity to comment on the draft, after which the Final Environmental Impact Statement will be released. A decision from the DOE will be issued approximately 30 days from the publication of “Notice of Availability of the Final EIS” in the U.S. Federal Register.

Sea Breeze initiated the process for a Presidential Permit in December, 2004, which will be granted subject to determination by the DOE that the project is in the public interest. The EIS process is required under the U.S. National Environmental Policy Act, and describes and evaluates the environmental impacts of the project, and which mitigation measures, if any, would be appropriate.

Notice of the D-EIS for the Juan de Fuca Cable can be found in the Federal Register, dated March 9, 2007.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues