Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.


  

First 345 kV XLPE Underground Cable Reference in the U.S. for Brugg Cables

Brugg Cables, from Switzerland, announced the successful commissioning of their first 345-kV XLPE underground cable installation in the United States. Earlier this year the new system was provided to NSTAR, the electric and gas utility serving customers in the Boston, MA area and Eastern Massachusetts. This connection is part of the larger NSTAR 345-kV Transmission Reliability Project designed to enhance the region’s electrical capabilities. The 345-kV XLPE system consists of two circuits between newly installed 345-kV transformers and reactors and 12 terminations installed at the K Street Substation in South Boston. An XLPE cable solution for these tie lines was chosen because of space limitations and the urban location of the substation.

The 345-kV XLPE cable was produced at Brugg’s facilities located in Brugg, Switzerland approximately 20 miles northwest of Zurich. The cable is designed for a continuous transmission load of 600 MVA per circuit and was supplied with a copper corrugated sheath for added strength and flexibility. The cable was laid in PE conduits and protected by a concrete cap above. The installation was done by Mass. Electric Construction Co. under the supervision of Brugg Cables.

The importance of this installation to the overall 345-kV Transmission Reliability Project required special attention to long- term reliability aspects of the cable system. For instance, in order to provide additional system protection, each of the 12 terminations was equipped with a newly developed partial discharge (PD) sensor based on UHF technology. These sensors allow the system operator to monitor and assess the condition of the terminations at any time and thus allow him to make decisions well in advance of any problems that may occur during operation.

“We are proud that we were selected by NSTAR as the supplier for this challengingproject,”said Frank Tomczyk, Brugg Cables LLC, National Sales Manager for the U.S. market located in Rome (GA). “Providing a proven, reliable and environmentally friendly cable solution together with highest quality accessories for this important project will further encourage U.S. utilities to specify XLPE underground cable for their future EHV requirements.”

Want to use this article? Click here for options!
© 2012 Penton Media Inc.

T&D TV

Most Read


Find Other Popular Items

Community

T&D World TV


Thomas & Betts - Collaboration. Commitment. Customer-Focus: Our promise to you. With over 50 years of pioneering design expertise and a partnership approach to every project, Thomas & Betts has a well-earned reputation as an innovator and a problem solver. Watch Now »


Siemens - Covering the entire spectrum of energy automation. Watch Now »

Podcasts

Building a Smarter Grid: Managing Assets to Improve Utility Decision Making
Sponsored by ABB
Join Greg Scheu, President and Head of Power Products for ABB, and Rick Bush as they discuss how utilities can extract more value from existing grid infrastructure by managing the overall assets of the T&D operation. Listen Now »

More from Building A Smarter Grid


Electromagnetic Pulse Discussion with Eric Hsieh
NEMA Government Relations Manager Eric Hsieh discusses an EMP and its possible effects on the electric grid.

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues