Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

National Grid Requires Road Closing for 400-kV Overhead Line Rewiring

National Grid is advising residents and motorists of forthcoming temporary traffic management measures as part of an ongoing £50 million project to upgrade and refurbish a major overhead power line running through Norfolk, UK.

National Grid is carrying out work on an eight-month project to rewire the 52-mi (84km) high-voltage line, running between Norwich and Walpole, near Wisbech. Engineers will renew the conductors (wires) and fittings and carry out strengthening work on some of the 224 pylons that carry the wires.

Project Manager Simon Chandler said: “This work will help to ensure that our electricity supply continues to serve us safely, reliably and efficiently for decades to come, securing our energy supply for future generations.

“We apologize for any inconvenience caused, but the road and lane closures are essential for the safety of the public and our workforce. We will make every effort to complete the work as safely, quickly and efficiently as possible.”

The 400-kV power line was built in the early 1960s and now needs refurbishing. The work will enable National Grid to increase the capacity of the line and the network in East Anglia to secure future energy supplies. The project is being carried out by National Grid, leading an electricity alliance with Balfour Beatty.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues